0

Your Cart is Empty

Sold out

Waqaf Motorised Borehole (Telaga Air)

Notify me when this product is available:

For Phase 3, we will commence the construction in September/October 2023 (once the funding is sufficient). Insya Allah.

Each Motorised Borehole costs $10,000 to construct (price increase due to the cost of construction materials and weak Nigerian currency).

  • Digging of Borehole (70-90m)
  • Metal Tower x 1
  • Plastic Water Tank x 1
  • Diesel Portable Generator x 1
  • Water Basin with Tiles x 1
  • Water Pipes x 10
  • Color Signboard with Metal Stand (Names of Donors) x 1

1 Motorised Borehole = 20 Waqaf Lot
1 Waqaf Lot = $500 (1 Donor's Name)

The constructions will commence in November/December 2022 and all are expected to be fully completed by January 2023. Insya Allah.

Once the project is completed and commissioned, photos and certificates (softcopies) will be sent to you by Whatsapp, PM, or email (whichever your preference) within 2-3 weeks.

----------------------------------------------------

 

COMPLETED WATER PROJECT IN NIGERIA (PHASE 1)


----------------------------------------------------

COMPLETED WATER PROJECT IN NIGERIA (PHASE 2)

Videos : Click here to watch all the videos

Photos : Click on the link below

 Motorised @ Layin Bangis

 Motorised @ Layin Baban

 Motorised @ Layin Bursar

 Motorised @ Mangwarori Muchiya

 Handpump @ Yandaka

 Handpump @ Angwan Sarki

 Handpump @ Layin Idi Dan Kwakwa

 Handpump @ Angwan Kanawa

 Handpump @ Gidan Na Ruma

 Handpump @ Angwan Fulani

 Handpump @ Gidan Sarkin Dangi

❤ Handpump @ Gidan Alhaji Kangimi

----------------------------------------------------

Why is the cost of constructing the hand pump borehole higher than other countries in Asia?

This cost is determined by the cost of materials in Nigeria, the difficulty in transporting these materials into remote areas, and the heavy equipment needed to drill deeply (usually between 70m-90m), often through rocky soil.

Please refer to the photos to view the heavy-duty borehole drilling process that we did for our past projects.

Please refer to the photos to view the heavy-duty borehole drilling process that we did for our past projects.

Insya Allah we will accomplish this amanah with the assistance of our trusted partner in Nigeria, Isah Chikaji Foundation (ICF).

If you need any clarification, please contact us. Thank you :)

 

----------------------------------------------------

 


 

Sample of signboard that will be installed at the waqaf site.